Thursday, 28 June 2012
Evaluation
I have completed all the required tasks and activities that were set . I have followed the brief by doing fabric manipulation on my final piece and on my samples. I feel that my final piece did answer to the theme that was set because I did a repeat pattern in the background which was my local area, I managed my time during the project by doing various different tasks, I did my samples ad tasks during different weeks and then I focused two weeks on my final 1 metre length and final samples. I planned my ideas by drawing out my final ideas and linking my samples to my final metre length fabric. I think I did enough sampling you can see this in my samples. I used different fabric manipulations such as pleating and different textures this is on my final metre fabric. I got my inspiration from various samples and used them in my final piece. I looked at different artist. The artists I looked at were Teesha Moore, Dion Archibald ad Stephen Campbell. These artists influenced me in different ways. I never found any problems with completing these tasks. I think I can develop my work further by keeping a good time keeping , and concentrate more.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment